Architecture
Formwork, Sill Plates, Floor Joists, Oh My!
Posted 2 January 2012 by Tom Fitzgerald IN / 0 responsesWith this addition, more weight will be placed on the existing foundation walls. To ensure that loads are properly transferred to the ground, pillars will be constructed to distribute the loads throughout the basement level to relieve the foundation walls of the extra weight. Below you can see formwork laid […]
Construction Documents
Posted 9 December 2011 by Tom Fitzgerald IN / 0 responsesOnce the client and designer have ironed out the programming, aesthetics and design functionality together the designer finalizes the design in a Construction Documents drawing set. There are many details included in this drawing set that had not been brought forward to the client before. Zoning, Code, Notes to the Contractor, Demolition drawings, […]
Schematic Design: 3rd Meeting
Posted 26 October 2011 by Tom Fitzgerald IN / 0 responsesBy the third Schematic Design meeting both the Architect and client are looking to come to a resolution on many of the design options provided. At this point the large components of the project such as foundation walls, exterior and interior walls, and roof lines have been decided upon. This […]
Schematic Design: 2nd Meeting
Posted 25 October 2011 by Tom Fitzgerald IN / 0 responsesAt this point of the Schematic Design process we have developed a good understanding of what the client wants and is looking for. We continue to develop the final product, focusing in on the finer details such as materiality, cabinets/storage, and furniture placement as we move further into the design. Typically, 3 different […]
Existing Conditions
Posted 19 October 2011 by Tom Fitzgerald IN / 0 responsesOnce we return to the office we transfer our hand sketched drawings and measurements into a digital drawing/model with AutoCAD and/or Revit Architecture (depending upon the requirements for the project). This provides our office with base drawings we can work off of for the proposed construction. The existing condition drawing set will be […]
Field Visit
Posted 17 October 2011 by Tom Fitzgerald IN / 0 responsesOnce the client has accepted the proposal and signed a contract we begin our FAS design process. We begin with visiting the site. If the project is a new build we visit to document the surrounding conditions with photos, measurements of the site and any environmental factors that may have an […]
Hello world!
Posted 13 October 2011 by Tom Fitzgerald IN / 0 responsesWelcome to Fitzgerald Architecture Studio‘s new blog! Each week we will be posting updates, news and projects from the studio. First, we will track the progress of one of our Residential projects as we update a forgotten historical farm house into a useful and livable space. Stay tuned as we get this blog underway…
Recent Comments