Posts Tagged:
Design Development
Schematic Design: 3rd Meeting
Posted 26 October 2011 by Tom Fitzgerald IN / 0 responsesBy the third Schematic Design meeting both the Architect and client are looking to come to a resolution on many of the design options provided. At this point the large components of the project such as foundation walls, exterior and interior walls, and roof lines have been decided upon. This […]
Schematic Design: 2nd Meeting
Posted 25 October 2011 by Tom Fitzgerald IN / 0 responsesAt this point of the Schematic Design process we have developed a good understanding of what the client wants and is looking for. We continue to develop the final product, focusing in on the finer details such as materiality, cabinets/storage, and furniture placement as we move further into the design. Typically, 3 different […]
Recent Comments